Current location:Homepage  >  News Center  >  Group News

Mao Zhongan went to the local construction and development company to inspect and guide the work

Release date: 2021-07-02    Author:    Source: Land Construction Comprehensive Development Company    Clicks: 2671   Share to:

June 30,Mao Zhongan, deputy general manager of the group company, went to Fuping Four Seasons Sunshine Hotel project to inspect and guide the work。

Mao Zhongan inspected the construction status of the retaining wall on the east side of the hotel,Gived guidance on the design optimization of retaining walls,And put forward relevant work requirements。He emphasized,Technical feasibility must be considered during engineering design、Security,We must also consider factors such as cost,Require the design unit to consider the actual situation on site and relevant opinions,Further optimize the design plan,Ensure design is reliable,Cost controllable;The project department shall base on the optimized design plan,Organize construction as soon as possible,Strengthen on-site management,Accelerate dafabet mobile appconstruction progress,Ensure construction tasks are completed with quality and quantity。(Han Jingjing)