Current location:Homepage  >  News Center  >  Group News

The group company organized the second safety inspection of the land reclamation project on the west bank of the Yellow River

Release date: 2016-04-05    dafabet casino mobile appAuthor:    Source:    Clicks: 6511   Share to:

April 2,By the Group Chief Accountant、Lead by Sun Jianhong, Minister of Legal Audit and Supervision,Engineering Technology Department、Relevant personnel from the Legal Audit and Supervision Department participated,Conducted safety inspection on the land reclamation project on the west bank of the Yellow River。The purpose of this inspection is mainly to review the safety hazards detected on March 17 and the resumption of construction after the Peach Blossom Flood Control Alert was lifted on March 25。

At the symposium after visiting the construction site,After Chief Accountant Sun Jianhong listened to the report of Liu Wangfeng, deputy general manager of the Yellow River Branch, and Wang Junshang, general manager of the Comprehensive Development Company, on the safety and security work of the project department after the flood control alert was lifted,Full recognition of the project department’s safety work in flood control,She emphasized,The Hancheng project is one of the group’s landmark projects,It is also a livelihood project in Hancheng City,Everyone in the group attaches great importance to it,The first phase of the Xiayukou extension control project is nearing completion,The subsequent land reclamation project on the west bank of the Yellow River will be extremely large,The number of earthmoving vehicles has doubled,Producing safety in production is the top priority。She requested,First, the project department should organize and hold dafabet loginspecial meetings on production safety on a regular basis,Strengthen education and training for construction site managers,Monitor flow and water level at fixed points every day;Second, all participating units must form a liaison mechanism,Select some construction workers with strong sense of responsibility as full-time safety administrators,Shard management,Responsibility at every level,Ensure all-round monitoring of the project area, especially near the river,People and vehicles staying at the construction site must be persuaded to leave in a timely manner;Third, the project department must conduct safety inspections,Identify the problems and ask the construction unit to rectify them in a timely manner,On the basis of safe and civilized construction,To ensure the quality of subsequent land reclamation projects,Improve the overall image of the project。

Underground Construction Comprehensive Development Company、Supervision and construction units participated in the inspection work。